Project Name: Bethany K-2 School
Owner: Bethany School
Architect: Emersion Design
CMR: Conger Construction Group
Scope: Provide and Install Educational Casework
Completion Date: July 2020
Tucked away in the suburb of Glendale Ohio resides The Bethany School, a local private school not twenty minutes from Cincinnati. As the Bethany School looked to build a new Elementary School, Farnham Equipment Company was able to deliver and install the casework portion of the project.
This project was conducted in two phases, the first beginning in early 2019 and the second concluding towards the summer of 2020. In each phase, Farnham Equipment provided Educational Casework with a Fusion Maple accent throughout the new Elementary School.
The Bethany School was a project which included different scopes of work, all within a small time frame. Stevens Build and Hold program allowed Farnham to be able to deliver exactly when Conger Construction required for their project deadlines. As a result, Farnham Equipment was able to provide quality and consistent Casework to the project while meeting the project demands.
To see the full scope of the Bethany School, visit our project gallery.